Midnight Woodworking

Woodworking

Bed upgrade – day 4

Before I assemble the footboard permanently, I need to install the bed rail fasteners. I bought Rockler’s 6″ bed rail fasteners. I noticed a lot of mixed reviews on them. … Continue reading

May 15, 2014 · 2 Comments

Bed upgrade – day 3

I had a chat with the clients this past weekend. They wanted to know if I could extend the beaded panel through the extensions. I admit the head and footboards … Continue reading

May 13, 2014 · 1 Comment

Bed upgrade – day 2

To cut the 3/4″ wide mortises, in the extension blocks, for the headboard, I am using a 3/4″ drill bit to hog out most of the material. I grabbed my … Continue reading

May 10, 2014 · Leave a comment

Bed upgrade – day 1

I have a new challenge on my shop floor this week. A friend of mine asked me to upsize a headboard and footboard from a queen to a king. They … Continue reading

May 8, 2014 · Leave a comment

Some custom crown molding

The storage cabinets, that I built, a few months back, were supposed to have crown molding at the top. To match the existing profile, on their other furniture (built many … Continue reading

May 4, 2014 · Leave a comment

Rob’s humidor project – day 5

It has been a quiet week in my shop, because I took a little break over Easter. Rob came over last night to try to finish up on the prototype … Continue reading

April 30, 2014 · Leave a comment

Rob’s humidor project – day 4

Rob’s quadrant hinges finally arrived, so last night we started installing them. We were a little cramped for space, since I am still in spring cleaning mode. Everything is strewn … Continue reading

April 23, 2014 · Leave a comment

A little spring cleaning

It seems like there has been just one project after another lately. I haven’t had a chance to clean up the mess from one piece of furniture, before starting the … Continue reading

April 18, 2014 · 2 Comments

Rob’s humidor project – day 3

Since the hinges did not yet arrive, for the humidor, we decided to get everything cut and finished, so the prototype could be quickly assembled when the hinges do arrive. We … Continue reading

April 16, 2014 · Leave a comment

Tabernacle build – delivered

Just a quick post today. I delivered the new tabernacle this morning. It now sits in the chapel, on the stand, that I built for it, a few months ago. … Continue reading

April 13, 2014 · 2 Comments

Tabernacle build – day 13

I put the third coat of poly on early this morning so I would have time for one more today. Before applying the fourth coat, I sanded the entire thing … Continue reading

April 12, 2014 · 1 Comment

Tabernacle build – day 12

Well, the stain has had about 12 hours to dry, and the can says a minimum of 8, so I should be good to start applying the finish. All of … Continue reading

April 11, 2014 · 1 Comment

Tabernacle build – day 11

After pulling the clamps off of the glued up door panel, I used my smallest chisel to mortise out the area where the pivot on the knife hinge sits. I … Continue reading

April 11, 2014 · 2 Comments

Tabernacle build – day 10

I worked on the door panel last night. I don’t actually have a complete plan for what it will ultimately look like when completed, just a vague notion of what … Continue reading

April 10, 2014 · Leave a comment

Rob’s humidor project – day 2

Last week we got the sides cut and rabbeted, so we started with glueing them up. With the box assembled, We cut the top and bottom to fit tightly within … Continue reading

April 9, 2014 · Leave a comment

Tabernacle build – day 9

  After sanding the columns and their banding to match the cabinet body, I applied glue to the first column and clamped it in place. Since the first one attached … Continue reading

April 7, 2014 · 3 Comments

Tabernacle build – day 8

Today I spent several hours working on the banding for the columns. Yesterday, I set up a sacrificial work table and fence on my 12″ miter saw. This tool is … Continue reading

April 5, 2014 · Leave a comment

Tabernacle build – day 7

The new upper base is dry and marked, so I cut the circle out on the bandsaw. I sanded the edges on the spindle sander, taking the edge down to … Continue reading

April 4, 2014 · 2 Comments

Tabernacle build – day 6

I only had a couple of hours to work this evening, so I took care of some small things. I measured and cut the spacers for the hidden door plate. … Continue reading

April 2, 2014 · Leave a comment

Rob’s humidor project – day 1

Rob came back over last night to start a new project. He wants to build a humidor, so we did some research. I contacted Chris Adkins at High Rock Woodworking . … Continue reading

April 2, 2014 · Leave a comment

Number of visitors

  • 342,770 hits

Enter your email address to follow this blog and receive notifications of new posts by email.

Join 199 other subscribers

Browse by catagory

Browse my archive