Altar platform part 7
Time to prep all the maple flooring for install. I have an area of roughly 75 square feet to cover with premium hard maple. I picked up five packs of … Continue reading
Altar platform part 6
Time to pre-finish the stair treads. The treads and the hardwood flooring are the only components left to be finished. I will finish the flooring after everything else has been … Continue reading
Altar platform part 5
Pre-finishing all of the trim and plywood at once would take up way more room that I have in my shop. I moved the majority of the structure out of … Continue reading
St. Kilian chapel – Tabernacle stand – part 4
I got to talk to the contractor who is laying the tile in the chapel and he gave me a final dimension for the height of the tabernacle stand. I … Continue reading
St. Kilian chapel – Credence table – part 4 & Gift table part 2
So the credence table and gift table are stained and ready for finish. Normally, I throw up my temporary spray booth and spray, covering two days worth of work in … Continue reading
Lectern Day 5 – Delivered
Before applying the second coat of polyurethane, I have to sand down the first coat with 400 grit paper to smooth out the surface. Even though this thing was inside … Continue reading
Lectern Day 4
The column is complete so it is time to make the top part. I joined up two pieces, to make the bottom, and left them to dry. I laid out … Continue reading