Midnight Woodworking

Woodworking

Tag Archives: installing cabinet doors

Erin’s Fireplace bar – day 11 Delivered

Over the last couple of days we applied three coats of polyurethane to the bar. Between each coat, we sanded the entire thing down with 400 grit sandpaper. When the … Continue reading

September 9, 2016 · Leave a comment

Erin’s Fireplace bar – day 10

Almost ready to wrap this project up. Just a few more details and we should be able to install this weekend. When I did the dry-fit on Saturday, I took … Continue reading

September 6, 2016 · Leave a comment

Erin’s Fireplace bar – day 9

Erin came over last night, so we started working on the caps for the corbels. She cut and planed a piece down to 1/2″ thick for the first of the … Continue reading

September 3, 2016 · Leave a comment

Erin’s Fireplace bar – day 8

We had a chance to do a bit more work, on the bar, last night. We started by attaching the face by running wood screws through the flange on the … Continue reading

September 1, 2016 · Leave a comment

Bathroom Vanity – day 7

I pulled all the clamps off the drawer faces and cabinet door, then sanded off any glue squeeze-out. Once all the surfaces were smooth and flat, I moved on to the … Continue reading

December 4, 2015 · Leave a comment

Altar cloth and storage cabinets – day 14

I am really close to finishing this cabinet. I just had a few details left. I started with the edge banding on the shelves. I grabbed a 2″ wide piece … Continue reading

March 10, 2014 · Leave a comment

Number of visitors

  • 269,513 hits

Enter your email address to follow this blog and receive notifications of new posts by email.

Join 182 other subscribers

Browse by catagory

Browse my archive