Walnut counter – day 6 – installed
After the first coat of urethane had cured, I had Erin sand down everything with 400 grit paper. Then she proceeded to apply the second coat. Over the next day … Continue reading
December 5, 2016 · 1 Comment
Walnut counter – day 5
The epoxy cured over night, now it is time to start sanding. Erin started with 80 grit paper to remove the bulk of the excess epoxy, then stepped down to … Continue reading
December 1, 2016 · Leave a comment